Status

Where the work stands

Updated 3 November 2026. The condition on all three papers: each is written only if its numbers come back.

PaperStageWhat is needed nextTarget
1 · Cost today Gap confirmed · data asks in preparation Programme budgets from the network partners: GO-SHIP line costs, ship pCO2 system costs, mooring and float costs, synthesis effort. One check first: whether the SOCONET design submitted to WMO G3W in 2026 is already costed. March 2027
2 · Requirements and technology Scoping A detection-threshold analysis for at least one mCDR pathway; numeric accuracy and density targets mapped onto what today's networks deliver; an engineering and platform-technology partner for the roadmap. To be set
3 · Savings and scale Gap confirmed · survey design Per-tonne MRV cost from registries and developers (none is public today); the shared-system costing built from papers 1 and 2. To be set

Project log

  1. Novelty assessment completed against the peer-reviewed and grey literature, 2015 to 2026. Gaps confirmed for papers 1 and 3; paper 2 to be written as a quantitative requirements synthesis. About 40 new references identified.
  2. Framing revised: three papers about one system at three moments. Economics and policy made explicit under all three; paper 3 defined as a cost curve versus scale.
  3. Plan presented to the OVSN meeting. Feedback: proceed with paper 1; paper 2 to inform and guide research; paper 3 as a sensitivity of scenarios, scale versus cost, concluding with a market analysis.
  4. Scope agreed and first literature synthesis completed: 53 references and 34 programme sources. Same day, the London Convention and Protocol parties adopted assessment frameworks for marine geoengineering research.
  5. First discussion with the WHOI Marine Policy Center on the economics of a shared observing system.